Anchorage Water & Wastewater Utility Pump Station 52
Location: Eagle River, AK
This pump station, originally constructed in 1982, was upgraded in 2008 with new piping, pumps, valves, lift station top slab, and standby generator. The 2008 lift station design was based on serving a fully built-out basin consisting of 204 homes. The addition of the Powder Ridge Subdivision required 98 more sewer service connections, which Pump Station 52 capacity could not adequately serve. CRW provided design, public involvement, permitting, bidding support, and construction support to upgrade the pump station in 2021 to serve the additional subdivision and accommodate future developments.