Lower Kuskokwim School District Bethel Campus Utilidor Upgrades
Location: Bethel, AK
CRW provided design, bidding, and construction administration for this fast-tracked utility project, which replaced aging water, sewer, add-heat, and fire protection pipelines within the Lower Kuskokwim School District Bethel Campus utilidor system. The project also included structural and mechanical design of a new heated utilidor, lift station, and 2,000 linear feet of arctic water and sewer lines.