Projects Select Category Airport Engineering Construction Administration Electrical Engineering Energy Sector Services Environmental Engineering Federal Services Geotechnical Engineering Hydraulics & Hydrology Mechanical Engineering Planning> Rural Infrastructure Site Development Structural Engineering Survey and Mapping Transportation Engineering Wastewater Collection & Treatment Water Distribution & Treatment Airport EngineeringOffice of Aviation Services HangarCRW provided civil and structural design for a new 20,000 sf aviation hangar and a 9,000 sf weather shelter hangar....VIEW PROJECT>Lake Hood Alpha-BravoThe Lake Hood Seaplane Base A and B general aviation aircraft parking areas were rehabilitated, including new asphalt surfacing over...VIEW PROJECT>Merrill Field Runway 5-23 LightingThis project provided runway lighting for the gravel/ski strip 5-23, edge lighting for Taxiways T and G, power regulator upgrades,...VIEW PROJECT>Alaska Airlines HangarSite and utility design were provided for the construction of a new, 60,000-square-foot maintenance hangar for Alaska Airlines. The site...VIEW PROJECT>Lake Hood Lakeshore TaxilaneThis project rehabilitated 1,900 feet of taxiway at Lake Hood Seaplane Base. The improvements included new pavement structural sections, ditching,...VIEW PROJECT>Merrill Field Taxiways G & Q, Phases 5, 6 & 7This fast-paced reconstruction of Taxiways G and Q and the Golf East and Quebec Aprons included new structural sections, pavement,...VIEW PROJECT>Anchorage International Airport Taxiway FReconstructed to FAA standards, the Taxiway F improvements included a new structural section; shoulder paving; and the replacement of lighting,...VIEW PROJECT>Lake Hood Taxiway VThese improvements brought Taxiway V into conformance with the Airport Layout Plan's ultimate designation and included structural section replacement, shoulder...VIEW PROJECT>Construction AdministrationNorthern Lights Boulevard Chester Creek CulvertThe Chester Creek culvert underneath Northern Lights Blvd failed during the winter of 2020. As a fast paced, emergency repair...VIEW PROJECT>Emmonak Water & Sewer System ImprovementsWorking directly for the City of Emmonak, CRW provided planning, surveying, design, permitting, and construction administration services for upgrades to...VIEW PROJECT>Rampart Wastewater Lagoon ImprovementsCRW provided construction administration services for wastewater lagoon upgrades in Rampart, Alaska. The project included the construction of a new...VIEW PROJECT>Sitka Critical Secondary Water SupplyCRW designed a new fish-safe intake and raw water pump station on Sawmill Creek, serving as a secondary water supply...VIEW PROJECT>Quinhagak Water & Sewer ProjectThis multi-year project included managing budgets, schedules, workforce, and procurement activities. Almost every type of utility construction project was involved:...VIEW PROJECT>Seldovia Water Treatment PlantAs the Engineer of Record, CRW provided years of construction management services. Tasks included managing budgets, schedules, workforce, and procurement...VIEW PROJECT>Merrill Field Airport Capital ImprovementsCRW provided construction administration and daily on-site field inspection services of the dynamic compaction of the old landfill below Merrill...VIEW PROJECT>Eagle River Wastewater Treatment Facility Rehab – Phase IIFull-time construction management and on-site field inspection services were provided by CRW. Our personnel met daily with Anchorage Water and...VIEW PROJECT>Electrical EngineeringEklutna Water Treatment Facility UpgradesThe entire 30-year-old primary electrical supply for the main water source was replaced preemptively before it became an emergency. The...VIEW PROJECT>CITY & BOROUGH OF SITKA CRITICAL SECONDARY WATER SUPPLY PROJECTThis project included the design of a new water intake and 6 MGD water treatment plant (WTP). The new WTP...VIEW PROJECT>C Street Phase 2 Electrical EngineeringCRW provided the electrical engineering design for the C Street and 7th Avenue Transit Phase 2 project. The design included pedestrian light pole...VIEW PROJECT>Anchorage Water & Wastewater Utility PRV Rehabilitation ProjectsCRW prepared design documents to upgrade existing pressure reducing valve facilities for Anchorage Water and Wastewater Utility. Facility systems were...VIEW PROJECT>Bethel Wind TurbineCRW was selected to design and permit a 900-kilowatt, grid-connected wind turbine in Bethel. Our responsibilities included the review and...VIEW PROJECT>Seldovia Water Treatment PlantPower, lighting, and controls were designed for a new greensand filtration system. The power feed was extended several thousand feet...VIEW PROJECT>Palmer Wastewater Treatment PlantCRW provided structural, mechanical, and electrical engineering services, in addition to surveying services, for an update of the City of...VIEW PROJECT>Energy Sector ServicesTogiak Energy System UpgradeThe existing, 30-year-old energy infrastructure had exceeded its useful design life. The power plant was replaced with a pre-engineered metal...VIEW PROJECT>St. Mary’s Energy System UpgradeThis project includes planning, design, and construction support services for a new tank farm and power plant facility. The work...VIEW PROJECT>Pilot Station Energy System UpgradeExisting facilities were located on the bank of the Yukon River and subject to flooding. This multi-faceted project relocated the...VIEW PROJECT>Teller Energy System UpgradeA new modularized power plant with a heat recovery system and 110,000-gallon, bulk fuel tank farm were constructed on a...VIEW PROJECT>Environmental EngineeringSitka Critical Secondary Water SupplyCRW designed a new fish-safe intake and raw water pump station on Sawmill Creek, serving as a secondary water supply...VIEW PROJECT>Arctic Village Water Treatment Plant & WasheteriaCRW provided planning, a pilot study, and design for a new, fill and draw, water treatment plant and washeteria. The...VIEW PROJECT>Mertarvik Water & Sewer DesignThe Mertarvik site is being constructed to relocate Newtok residents who are in danger of losing their community due to...VIEW PROJECT>Quinhagak Water & Sewer ProjectThe services provided by CRW included analysis, testing, design, and construction of the community water source, consisting of three slant...VIEW PROJECT>Napaskiak Water Treatment Plant UpgradesThe public water utility treats water at two water treatment plants from two separate groundwater sources. To remove iron and...VIEW PROJECT>Unalakleet Public Water SystemThe public water system contained elevated levels of organics and had limited capacity to meet summer water demands. Upgrades included...VIEW PROJECT>Seldovia Water Treatment PlantCRW completed the design, permitting, force account construction management, and start-up for a new water treatment plant, which treats the...VIEW PROJECT>Federal ServicesUS Army Corps of Engineers Joint Base Elmendorf Richardson (JBER) Building 8517 Earthquake RepairThis 160,000 square-foot, 1950’s “People Center” located at JBER, was damaged by the Alaska magnitude 7.1 November 2018 earthquake. Damages...VIEW PROJECT>US Customs and Border Protection Canine KennelCRW provided structural, mechanical, electrical, and civil engineering services to assist the contractor in designing a new 10 kennel canine...VIEW PROJECT>United States Coast Guard (USCG) Kodiak Wastewater Treatment Facility (WWTF)This project involves two phases. The first phase evaluates existing wastewater treatment plant/process/operations and the lift stations conveying wastewater to...VIEW PROJECT>Federal Aviation Administration Fairbanks Automated Flight Service Station (AFSS)This project includes engineering design services for a new 40-foot by 30-foot, single-story metal building at the AFSS in Fairbanks,...VIEW PROJECT>United States Air Force (USAF) Sparrevohn Long Range Radar SiteCRW provided design, construction administration, and commissioning services for this design-build bulk fuel project for the USAF at the Sparrevohn...VIEW PROJECT>Geotechnical EngineeringVictor Creek Temporary Bridge CRW provided axial and lateral pile design for a temporary bridge crossing Victor Creek as part of the Alaska Department...VIEW PROJECT>Valdez Container Terminal (VCT) Water Main ReplacementCRW performed a geotechnical investigation to support CRW’s design for a replacement water main on the island and causeway. The...VIEW PROJECT>UAA AV-Tech Building Earthquake RepairsCRW provided geotechnical support throughout the investigation and design of building and apron repairs due to the November 2018 Alaska...VIEW PROJECT>Kotzebue AC Store CRW performed a geotechnical investigation to support site development and foundation design for a new Alaska Commercial (AC) Store in...VIEW PROJECT>King Cove Solid Waste Services CRW performed a geotechnical investigation to support site development and design for a new solid waste processing facility in King...VIEW PROJECT>Geotechnical Investigation in Support of Horizontal Directional Drilling Design for a Private Development at ANCCRW planned and oversaw a geotechnical investigation to support the design of a buried fuel pipeline to be installed by...VIEW PROJECT>Rampart Sewage LagoonA geotechnical investigation was performed to support CRW’s design of a new sewage lagoon for the community of Rampart. The...VIEW PROJECT>Anchorage International Airport Taxiway Y Slope RepairCRW oversaw cone penetration testing (CPT) to investigate a shallow slide failure due to the November 2018, southcentral Alaska, magnitude...VIEW PROJECT>Hydraulics & Hydrology82nd Ave Pump StationCRW provided project management, design, and construction support services for the design of the 82nd Avenue lift station. CRW services included...VIEW PROJECT>Crawford Street Area Drainage ImprovementsDesign of a replacement stormwater lift station, controls, and force main in West Anchorage, replacing a 30 year old existing...VIEW PROJECT>Northern Lights Boulevard Chester Creek CulvertThe Chester Creek culvert underneath Northern Lights Blvd failed during the winter of 2020. As a fast paced, emergency repair...VIEW PROJECT>Meadow Creek at Old Eagle River RoadContinual flooding in this project area was due to an undersized culver. A larger box culvert was installed to pass...VIEW PROJECT>35th Avenue & McRae Road ImprovementsCRW worked with the Municipality of Anchorage to upgrade this 4,000-foot-long, neighborhood collector roadway located in west Anchorage. The project...VIEW PROJECT>Golden View Drive UpgradeImprovements to bring this two-mile-long section of hillside road to Municipality of Anchorage collector standards and provide a safer road...VIEW PROJECT>Chester Creek Culvert Replacement at Providence DriveTwo existing 78-inch-diameter corrugated metal pipe culverts that conveyed fish passage of Chester Creek beneath Providence Drive were replaced with...VIEW PROJECT>AMATS: Areawide Trails Rehab, Fish Creek TrailRehabilitation of this mile-long section of trail to improve safety and connectivity included replacement of four pedestrian bridges, installation of...VIEW PROJECT>Landfill Engineering & DesignKing Cove Solid Waste Processing FacilityCRW assisted the City of King Cove with a new Solid Waste Processing Facility. The project included surveying, developing an...VIEW PROJECT>Matanuska-Susitna Borough Central Landfill SurveyUnder term contract with the Matanuska-Susitna Borough, CRW is providing surveying services to support the Solid Waste Division’s operations at...VIEW PROJECT>Eek LandfillDesign and construction administration services were provided for a new Class III landfill facility and closure of the existing dump....VIEW PROJECT>Mechanical EngineeringBiomass Boiler DesignCRW provided mechanical and electrical engineering design, which will serve multiple buildings. This extreme winter temperature design will provide an...VIEW PROJECT>Mears Middle School Roof ReplacementFor this multi-phase renovation project CRW provided mechanical and electrical design and construction administration services to upgrade the roof and...VIEW PROJECT>North Slope Borough Transit Wash Bay UpgradeCRW provided design services to incorporate a new bus wash, water recycle/reclaim system, and commercial vacuums into the existing wash...VIEW PROJECT>Heat Recovery ProjectsCRW designed more than a dozen heat recovery projects for communities throughout western and interior Alaska. These heat recovery systems...VIEW PROJECT>Anchorage Water & Wastewater Utility 92nd Avenue PRV FacilityMechanical work for this new facility involved heating and ventilation, and layout of the 12-inch and 16-inch water piping and...VIEW PROJECT>US Air Force Diesel Fuel Bulk Storage ReplacementThis project included six, 37,500-gallon, aboveground storage tanks; an enclosure for fuel offloading; and a control building. Design of heating...VIEW PROJECT>Rogers Park Elementary School Roof & HVAC UpgradesCRW co-primed this multi-phase renovation project, which included systems upgrades to the roof drainage, domestic piping, and HVAC to provide...VIEW PROJECT>Palmer Wastewater Treatment PlantCRW provided structural, mechanical, and electrical engineering services, in addition to surveying services, for an update of the City of...VIEW PROJECT>PlanningKivalina Relocation Master PlanCRW is preparing the community Master Plan for Kivalina in support of the community’s expansion to K-Hill. The Master Plan...VIEW PROJECT>Native Village of Eyak (NVE) Housing Master PlanCRW is assisting the NVE with the development of a Housing Master Plan in Cordova. The NVE and the City...VIEW PROJECT>Department of Transportation & Public Facilities Copper River Highway Transportation Master PlanCRW is supporting the Alaska Department of Transportation & Public Facilities (DOT&PF) and the Native Village of Eyak in developing...VIEW PROJECT>Rural InfrastructureSeldovia Water Treatment PlantCRW completed the design, permitting, force account construction management, and start-up for a new water treatment plant, which treats the...VIEW PROJECT>Eek LandfillDesign and construction administration services were provided for a new Class III landfill facility and closure of the existing dump....VIEW PROJECT>Kipnuk Boardwalk ImprovementsMany rural communities use extensive boardwalk networks for mobile transportation, especially during the summer and fall seasons when the moist...VIEW PROJECT>Unalakleet Lagoon RehabilitationThe project upgrades involved removing over 30 years of sludge buildup and installing two, 30,000-gallon septic tanks to limit future...VIEW PROJECT>Quinhagak Piped Water & Sewer SystemCRW has worked successfully for 17 years on sanitation and infrastructure improvements. The long-term goal is to develop sustainable facilities...VIEW PROJECT>Arctic Village Water Treatment Plant & WasheteriaCRW provided planning, design, permitting, surveying, and force account construction management services for a new water treatment plant and washeteria...VIEW PROJECT>Site DevelopmentMedline WarehouseCRW provided survey, geotechnical, and civil design on this design-build project that involved construction of a 149,000 sf, multi-story warehouse on...VIEW PROJECT>Prince William Sound Science CenterCRW provided civil and structural engineering services for the Prince William Sound Science Center, consisting of a main building and...VIEW PROJECT>Office of Aviation Services HangarCRW provided civil and structural design for a new 20,000 sf aviation hangar and a 9,000 sf weather shelter hangar....VIEW PROJECT>Huffman Elementary School UpgradesCRW developed an inspection checklist to assess existing site conditions and to assist with designing recommended improvements. Traffic circulation and...VIEW PROJECT>Anchorage Football Stadium ImprovementsThis project featured an innovative type of artificial turf surfacing that looks and plays like real grass, a new track...VIEW PROJECT>Susitna Flats HousingThis multi-phase project began with determining the feasibility of developing the west end of the Park Strip. The site was...VIEW PROJECT>Alaska Airlines HangarLand surveying, civil, and site design were provided for a new Alaska Airlines hangar. The project successfully overcame the challenges...VIEW PROJECT>ML&P Plant 2 ExpansionCivil planning, design, and construction management services were provided on this design/build power plant expansion project, including surveying, retaining wall...VIEW PROJECT>Structural EngineeringAloft HotelThe new Aloft Hotel is Anchorage’s newest boutique hotel. The four-story, 146 room, wood framed hotel is approximately 80,300 square-foot...VIEW PROJECT>Prince William Sound Science CenterThis fast-tracked, Design-Build project entailed design for a new two-story, 24,000 square-foot science center. Shortly after award in January of...VIEW PROJECT>US Army Corps of Engineers Joint Base Elmendorf Richardson (JBER) Building 8517 Earthquake RepairThis 160,000 square-foot, 1950’s “People Center” located at JBER, was damaged by the Alaska magnitude 7.1 November 2018 earthquake. Damages...VIEW PROJECT>US Air Force Diesel Fuel Bulk Storage ReplacementStructural, civil, mechanical, and electrical engineering was provided for the replacement of an existing tank farm. The project consisted of...VIEW PROJECT>Palmer Wastewater Treatment PlantCRW provided structural, mechanical, and electrical engineering services, in addition to surveying services, for an update of the City of...VIEW PROJECT>Arctic Village Water Treatment Plant & WasheteriaCRW provided the structural and civil engineering, and process design for a new, 2,250-square-foot, water treatment facility and washeteria. The...VIEW PROJECT>Survey & MappingShotgun Cove Road ExtensionThe City of Whittier plans to extend Shotgun Cove Road 2.5 miles from its current terminus to Forest Service lands at Trinity...VIEW PROJECT>Valdez Container Terminal Water Main ReplacementThe Valdez Container Terminal is the state's fourth-largest port in terms of volume and plays a crucial role in serving the community...VIEW PROJECT>Matanuska-Susitna Borough Central Landfill SurveyUnder term contract with the Matanuska-Susitna Borough, CRW is providing surveying services to support the Solid Waste Division’s operations at...VIEW PROJECT>Whittier City Park Master Plan, Unmanned Aerial Vehicle (UAV) 3D ModelingUsing a survey-grade Leica unmanned aerial vehicle, CRW provided high-resolution aerial photography and a 3D point cloud for the planning...VIEW PROJECT>Kipnuk Boardwalk Improvements Vertical Survey ControlCRW's survey group provided the survey control, topographic survey, and as-builts of the existing boardwalk and structures for the design...VIEW PROJECT>Alaska State Land Subdivision Plat Boundary SurveySurveying, mapping, and platting were provided for bulk fuel storage tanks for the community of Edna Bay. The plat subdivided...VIEW PROJECT>Point Woronzof Wastewater Treatment Facility Hydrographic SurveyDue to tidal erosion around the Anchorage Water and Wastewater Utility effluent tower, a new erosion-control structure was constructed around...VIEW PROJECT>Alaska Airlines C Terminal Apron Design SurveyDuring active airport operations, CRW surveyors provided an as-built of the existing striping, aboveground structures, jetways, and utilities for a...VIEW PROJECT>Transportation EngineeringShotgun Cove Road ExtensionThe City of Whittier plans to extend Shotgun Cove Road 2.5 miles from its current terminus to Forest Service lands at Trinity...VIEW PROJECT>Image/Reflection Drive Area Road ReconstructionHigh groundwater and poor soils caused failed storm drainpipes, heaving roadways, and increased maintenance efforts in this east Anchorage subdivision....VIEW PROJECT>Parks Highway/Talkeetna Spur Road Pedestrian ImprovementsThe Alaska Department of Transportation & Public Facilities aimed to implement pedestrian improvements along the Parks Highway between Talkeetna Spur...VIEW PROJECT>UMED Pedestrian & Transit ImprovementsCRW provided planning and design of pedestrian and transit improvements along Providence Drive, including an analysis of transit stops, crosswalks,...VIEW PROJECT>AMATS Areawide Trails Rehabilitation, Fish Creek TrailRehabilitation of this mile-long section of trail to improve safety and connectivity involved the replacement of four pedestrian bridges, flood...VIEW PROJECT>Golden View Drive OverlayImprovements to bring this two-mile-long section of hillside road to Municipality of Anchorage collector standards and provide a safer road...VIEW PROJECT>Wastewater Collection & TreatmentQuinhagak Sanitation ImprovementsCRW provided the planning, design, permitting, and construction management services for both the wastewater collection and treatment systems. The wastewater...VIEW PROJECT>Anchorage Water & Wastewater Utility Pump Station 54AWWU's Pump Station 54 experienced numerous maintenance issues including pump faults and check valve failures. CRW evaluated the facility and...VIEW PROJECT>Anchorage Water & Wastewater Utility Pump Station 52This pump station, originally constructed in 1982, was upgraded in 2008 with new piping, pumps, valves, lift station top slab,...VIEW PROJECT>Whittier Harbor UtilitiesCRW designed sewer upgrades in Whittier's boat harbor area. The improvements included new sewer mains and manholes and two wastewater...VIEW PROJECT>Seldovia Water & Sewer ImprovementsCRW designed and managed the construction of water and sewer improvements for the City of Seldovia. The project included trenchless...VIEW PROJECT>Mountain Point Wastewater Treatment PlantCRW designed a secondary wastewater treatment plant for a peak capacity of 1.0 million gallons per day (MGD) and expansion...VIEW PROJECT>Anchorage Water & Wastewater Utility Lift Stations UpgradesCRW provided civil and electrical design services to Anchorage Water and Wastewater Utility for upgrading five wastewater lift stations in...VIEW PROJECT>Lower Kuskokwim School District Bethel Campus Utilidor UpgradesCRW provided design, bidding, and construction administration for this fast-tracked utility project, which replaced aging water, sewer, add-heat, and fire...VIEW PROJECT>Water Distribution & TreatmentSitka Critical Secondary Water SupplyCRW designed a new fish-safe intake and raw water pump station on Sawmill Creek, serving as a secondary water supply...VIEW PROJECT>Anchorage Water & Wastewater Utility 92nd Avenue PRV FacilityCRW provided design for AWWU’s new PRV facility that extended the 347 Pressure Zone (PZ) to the west and closer...VIEW PROJECT>Quinhagak Water & Sewer ProjectThis multi‐year, multi‐phase project brought much-needed sanitation infrastructure to the community of Quinhagak. CRW provided design and construction management of...VIEW PROJECT>Anchorage Water & Wastewater Utility Wonder Park Water & Sewer Phase IICRW evaluated the condition of the Wonder Park Subdivision utilities and provided design documents to replace 2,600 feet of severely...VIEW PROJECT>North Seward Water Storage Tank & Pumping FacilityCRW provided design for 8,500 feet of water main, a Class A public water well, 500,000-gallon insulated water storage tank,...VIEW PROJECT>Seldovia Water Treatment PlantDesign and permitting was provided for a new, pressure filtration water treatment plant, capable of producing up to 400,000 gallons...VIEW PROJECT>