Anchorage Water & Wastewater Utility Pump Station 54
Location: Anchorage, AK
AWWU’s Pump Station 54 experienced numerous maintenance issues including pump faults and check valve failures. CRW evaluated the facility and made recommendations for improvements, then designed a new wet well top slab and piping, isolation and check valves, a replacement generator, and all new electrical for the controls building. CRW also performed an analysis of the collection basin for existing and future flows, and sized and specified new facility pumps, which were procured separately on an emergency basis.