C Street Phase 2 Electrical Engineering
CRW provided the electrical engineering design for the C Street and 7th Avenue Transit Phase 2 project. The design included pedestrian light pole review, electrical site plan, control schematics, scheduling, and construction support. Our design required coordination with ML&P for the new load center and coordination with ACS for a communication service for the real time sign and CCTV cameras.